Infinity Drain — Projects — KPMG Learning Center 3

KPMG Learning Center

Project Type
Corporate
Designer/Architect
Gensler

Fabricator/General Contractor: SurePods/DPR Construction
About the Project

KPMG Lakehouse, designed by Gensler, is a high-tech facility on a 55-acre property that includes 800 rooms, which closely resemble hotel rooms. According to the “Big Four” accounting firm, it is a purpose-built place where their people will come for professional career development and networking.

Infinity Drain — Projects — KPMG Learning Center 1

DPR Construction utilized SurePods to prefabricate all 800 guest bathrooms offsite in a controlled warehouse environment.

Infinity Drain — Projects — KPMG Learning Center 3

According to Greg King, Assistant GM of SurePods, “During construction, bathrooms generate 80% of punch list and coordination challenges in a guestroom. By prefabricating the bathrooms completely offsite, we can save significant time on-site (as much as 2-4 months of schedule acceleration) and help ensure both quality & cost by providing our clients with a turnkey bathroom solution.”

Infinity Drain — Projects — KPMG Learning Center 4

Infinity Drain worked with SurePods to customize their award-winning Stainless Steel Shower Base and Solid top grate style Linear Drains for the project. Infinity Drain’s customized Shower Bases have a lifetime waterproof guarantee to give clients peace of mind.

Infinity Drain — Projects — KPMG Learning Center 2

And for SurePods, the Stainless Steel Shower Base solution offered significant manufacturing efficiencies. “The foundation of our business is built on efficiencies,” continued King. “Traditional foam-based shower pans create numerous elements and steps to our build process and Infinity Drain’s all-in-one solution is a great fit that saves us time and labor. We were able to work with Infinity Drain to get a dependable and unique customized product that fit our client’s design and our pre-fabrication needs.”

Infinity Drain — Projects — KPMG Learning Center 5

The $450 million site is SurePod’s largest project to date in the United States.